            Qingzhou Dahan Heavy Industry Co.,Ltd.
            Call me!
            Tel:0086 18353659311
            Email: Alice@qzdhzg.com
            Qingzhou Dahan Heavy Industry Co.,Ltd.
            Manager:Alice
            Mobile: 0086 18353659311
            Skype: Alice Chen
            WeChat: 1091767485
            WhatsApp: 008618353659311
            Tel: +86 0536 8800950
            Fax: +86 0536 8800950
            Website: www.halquinol.cn
            Address: The North Of Yiwangfu North Road, Economic Development Zone,Qingzhou ,Shandong ,China
            Home>>news

            Installation of hanging roller type cement pipe making machine


            1, the machine installation should consider supporting the project power, water, space, material transport channel and rainproof measures.
            2, the installation site need to smooth, solid foundation, foundation pit is slightly higher than the ground, to water into the pit.
            3, according to the foundation pit excavation, according to the local geological conditions, foundation pit size can be increased to deepen.
            4, on the cross on the top of the foundation pit two channel steel, used heavy equipment will be main frame and a movable door frame lift on the channel above, the anchor bolt wear to the machine base, and screw on the nut but do not tighten, to pour good foundation then tighten the.
            5, then put suspended roller shaft hoist with bolt fixed on the main frame of the coupling, this suspension roll axis of wire rope shall not be relaxed, the suspended roller shaft is inserted into the door frame of the taper hole, finally with the level of instrument to suspended roller leveling alignment.
            6, the mixing of concrete perfusion to the inside of the foundation pit, the concrete strength grade shall not be less than C20, and the vibrator compacting, should not have pores.
            page up:Basic maintenance of cement pipe making machinenext:Inspection and preparation before commissioning of cement pipe making machine
            product centers
            Contact us
            manager:Alice 0086 18353659311
            Address:North End Of Yiwangfu North Rd., Economic Development Zone, Qingzhou, Shandong, China (Mainland).
            Website:www.halquinol.cn

            Follow sweep the DAHAN Heavy Industries official website For more details, please have a call.
            Copyright ? 2005-2015 青州大漢重工有限公司All Rights Reserved  技術(shù)支持:山東中迅.濰坊百度
            国产综合色精品在线视频|玖玖视频国产|在线免费激情视频网|亚欧日韩欧美综合|亚洲av午夜精品无码专区|欧美AⅤ精品一区二区三区|国产精品1luya在线播放|亚洲 欧美 国产 视频二区

              <dl id="bh5qd"><source id="bh5qd"><span id="bh5qd"></span></source></dl>
                  • <delect id="bh5qd"><acronym id="bh5qd"></acronym></delect>
                    <tbody id="bh5qd"><pre id="bh5qd"></pre></tbody>
                      <tbody id="bh5qd"><pre id="bh5qd"></pre></tbody>

                    • <dl id="bh5qd"><source id="bh5qd"><span id="bh5qd"></span></source></dl>

                      <optgroup id="bh5qd"></optgroup><acronym id="bh5qd"></acronym>